The demolition is well underway. both lower bathrooms have been gutted with the guest bath already having its new pluming in and foundation poured. The guesthouse kitchen has also been stripped of shelving and appliances. In the main kitchen both the built-in and stand-alone appliances have been cleared. and The The basement stairs have been stripped back to beam in preparation for their move. The basement floor has been cleared of the old appliances and hydroponic pot closet. A few gems were discovered in that process.